Bloom Engineers & Associates Project Examples

Roseville School District

Swimming Pool Renovation &  Boiler Addition - St. Paul, Minnesota:

  • Replace existing pool equipment including filters, pumps, heaters, treatment equipment, and piping to meet code.
  • Replace existing pool ventilation unit with a dehumidification system which has the ability to heat pool water with rejected compressor heat.
  • New automatic pool covers.
  • New gas fired low pressure steam boiler, interconnected to the existing steam distribution system, to provide summer heat for domestic hot water and pool heating.
  • Replace lighting in pool room.

Swimming Pool Renovation &  Boiler Addition - St. Paul, Minnesota:

  • Provide Construction Management Assistance to keep project on schedule and in budget.
  • Assist Owner in
    • pre-purchasing major equipment
    • developing multiple bids
    • managing construction.
  • Project completed in budget and time required.

Little Canada  Boiler Addition - St. Paul, Minnesota:

  • New gas / oil fired low pressure steam boiler to provide primary heating to existing system.
  • Boiler is a back-up to a single twenty year old boiler.
  • Boiler size was reduced to provide full heating capacity to approximately 10°F.  It is anticipated that the existing boiler will be fired to handle loads below 10°F.  If the existing boiler fails to operate, the new boiler can maintain building temperatures with ventilation systems reduced.
  • Submit information for Xcel energy payback.

Roseville School District Various Projects - Falcon Heights, Minnesota:

  • Falcon Heights Middle School, Edgerton Middle School, Brimhall Elementary.
  • Additions built and remodeling of the schools including boiler additions.

Minneapolis School District

Swimming Pool Equipment Review and Report on four Swimming

Pools - Minneapolis, Minnesota:

  • Dowling Elementary School, Franklin Middle School, Northeast Middle School, and Olson Middle School.
  • Review condition of the existing swimming pool equipment and piping.
  • Review code compliance issues.
  • Report options, opinions, and recommendations of budget and construction costs.

Prior Project Examples of Principals

University of Minnesota

Northop Hall - Minneapolis, Minnesota:

  • Remodel kitchen and beverage serving area.
  • Modify plumbing and HVAC systems.

Earle Brown Institute - St. Paul, Minnesota:

  • Remodel existing kitchen and dining area into computer classroom area.

Winona State University - Winona, Minnesota

Richards Hall:

  • Remodel plumbing facilities.
  • Modify plumbing and HVAC systems.

New Health and Applied Science Building:

  • Interconnect mechanical utilities to the existing central chilled water and boiler plants.
  • New plumbing system.
  • Medical air, vacuum and oxygen, special exhaust and ventilation systems for various laboratory areas and HVAC systems for classroom area.

Osseo School District - Osseo, Minnesota

Park Center:

  • Remodel kitchen.
  • Modify swimming pool.
  • Boiler repair including burners, re-tubing.

Minnetonka School District - Minnetonka,     

Minnesota

  • Various remodel projects including a science lab media center.

 