Roseville School District
Swimming Pool Renovation & Boiler Addition - St. Paul, Minnesota:
- Replace existing pool equipment including filters, pumps, heaters, treatment equipment, and piping to meet code.
- Replace existing pool ventilation unit with a dehumidification system which has the ability to heat pool water with rejected compressor heat.
- New automatic pool covers.
- New gas fired low pressure steam boiler, interconnected to the existing steam distribution system, to provide summer heat for domestic hot water and pool heating.
- Replace lighting in pool room.
Swimming Pool Renovation & Boiler Addition - St. Paul, Minnesota:
- Provide Construction Management Assistance to keep project on schedule and in budget.
- Assist Owner in
- pre-purchasing major equipment
- developing multiple bids
- managing construction.
- Project completed in budget and time required.
Little Canada Boiler Addition - St. Paul, Minnesota:
- New gas / oil fired low pressure steam boiler to provide primary heating to existing system.
- Boiler is a back-up to a single twenty year old boiler.
- Boiler size was reduced to provide full heating capacity to approximately 10°F. It is anticipated that the existing boiler will be fired to handle loads below 10°F. If the existing boiler fails to operate, the new boiler can maintain building temperatures with ventilation systems reduced.
- Submit information for Xcel energy payback.
Roseville School District Various Projects - Falcon Heights, Minnesota:
- Falcon Heights Middle School, Edgerton Middle School, Brimhall Elementary.
- Additions built and remodeling of the schools including boiler additions.
Minneapolis School District
Swimming Pool Equipment Review and Report on four Swimming
Pools - Minneapolis, Minnesota:
- Dowling Elementary School, Franklin Middle School, Northeast Middle School, and Olson Middle School.
- Review condition of the existing swimming pool equipment and piping.
- Review code compliance issues.
- Report options, opinions, and recommendations of budget and construction costs.
Prior Project Examples of Principals
University of Minnesota
Northop Hall - Minneapolis, Minnesota:
- Remodel kitchen and beverage serving area.
- Modify plumbing and HVAC systems.
Earle Brown Institute - St. Paul, Minnesota:
- Remodel existing kitchen and dining area into computer classroom area.
Winona State University - Winona, Minnesota
Richards Hall:
- Remodel plumbing facilities.
- Modify plumbing and HVAC systems.
New Health and Applied Science Building:
- Interconnect mechanical utilities to the existing central chilled water and boiler plants.
- New plumbing system.
- Medical air, vacuum and oxygen, special exhaust and ventilation systems for various laboratory areas and HVAC systems for classroom area.
Osseo School District - Osseo, Minnesota 
Park Center:
- Remodel kitchen.
- Modify swimming pool.
- Boiler repair including burners, re-tubing.
Minnetonka School District - Minnetonka,
Minnesota
- Various remodel projects including a science lab media center.