Pillsbury Tower |
Centennial Office Building |
Second Street Office Building - Hudson, Wisconsin
- Construct a new three story office building with an apartment on the upper level.
- Provide "Design Build" specifications denoting mechanical and electrical design outline and material requirements.
Wellness Center - Hudson, Wisconsin
- Tenant improvements to construct a wellness center / chiropractic facility.
- Remove the existing area with new HVAC system and plumbing system.
- Provide "As-Built" documents for construction.
Roseville Office Plaza - Roseville, Minnesota
- Provide a building analysis to identify the existing system's operating conditions and procedures.
- Provide a building vulnerability analysis to address the possibility of release of toxic materials from the Williams Pipeline, located within one hundred feet of the building, or a possible terrorist release of Chemical, Biological, Radiological (CBR) agents.
- Provide observations and identify options which may be implemented to help mitigate or enhance occupancy protection from such release.
Prior Project Examples of Principals
Pillsbury World Headquarters - Minneapolis, Minnesota
- Construct a 50-story office tower for Hines Corporation.
- Review and accept main building systems.
- Design auxiliary systems required for the Pillsbury Company.
- Provide special systems for the data center, test kitchens, main kitchen/dining area, telephone equipment room, conference areas, and boardroom.
State of Minnesota Centennial Office Building - St. Paul, Minnesota
- Remodel existing six story office building.
- Install new mechanical systems for entire building, which includes office space, 9,500 square foot data center, training rooms, conference centers, kitchen and dining area.
- Special mechanical systems include a 2,000 KW emergency generator, stair pressurization system, and floor smoke evacuation systems.
Health East, Midway Office - St. Paul, Minnesota
- Convert Midway Hospital into an office complex with an out-patient surgery department, utilizing as much of the existing systems as practical.
- Convert existing high pressure steam boilers to low pressure, add a chiller and cooling tower to replace failed equipment, modify piping arrangements, and modify HVAC systems to provide acceptable environmental control.
- Produce project utilizing a GMP package and fast tracking with selected contractors.