Boiler Plant

St. John's Hospital - Maplewood, Minnesota

  • Project Engineer / Project Manager for a $46 million dollar addition and remodeling project.
  • Provide plumbing, medical gas, fire protection, heating ventilating and air conditioning systems including a new boiler and chiller plant interconnected to the existing plants.
  • New medical air and vacuum systems interconnected with existing systems.

Metropolitan Mount Sinai Hospital - Minneapolis, Minnesota

  • Provide a study of the existing chilled water distribution system for Metropolitan Mount Sinai Hospital and Hennepin County Medical Center.
  • Install a 5,500 ton high-pressure steam turbine chiller interconnected with 5,000 ton of existing chillers.
  • Provide new condenser water pumps, primary water pumps and modify piping, valving and pumps in the distribution system.
  • Modify the existing boilers from 125# to 250# steam pressure.

Health East, Midway Office - St. Paul, Minnesota

  • Engineering services utilized to convert Midway Hospital into an office complex with an out-patient surgery department, utilizing as much of the existing systems as practical.
  • Convert existing high pressure steam boilers to low pressure.
  • Add a chiller and cooling tower to replace failed equipment.
  • Modify piping arrangements.
  • Modify HVAC systems to provide acceptable environmental control.
  • Produce project utilizing a GMP package, fast tracked with selected contractors.

 